01
When It Is Time to Replace a Roof
Most people start thinking about metal roof replacement in Pacific Palisades for one of a few reasons. The current roof is near the end of its life. There are leaks that keep coming back after repairs. The house is being remodeled and the roof is part of it. Or the owners want a roof that is noncombustible and Class A after living through the Palisades Fire, and they want to make the change before the old roof forces the issue.
The signs on the old roof depend on what it is made of. Clay or concrete tile roofs often look fine from the street while the underlayment below them has worn out, and that underlayment is what actually keeps water out. Asphalt shingles show granule loss, curling and cracking. Wood shake, which is no longer allowed in California fire hazard severity zones, dries and splits. An older exposed-fastener metal roof shows rust at the screws, worn washers and loose panels.
None of those signs means you need to act this week. We do not sell with urgency. What they mean is that a planned replacement, on your schedule, will be easier and cleaner than an emergency one.
02
What Happens During a Metal Roof Replacement in Pacific Palisades
Every replacement follows the same order. The details change from house to house, but the sequence is fixed because each step depends on the one before it.
1. Site Visit and Measurements
We come to the house, walk the roof where it is safe to do so, and measure every plane. We check the pitch on each section, because pitch decides which seam types the panel manufacturers allow. We note every wall, valley, chimney, skylight, vent and change in roof line. We also look at the street and the lot: where a delivery truck can park, how panels will be carried to the roof, and where the tear-off debris will go.
On a Palisades lot this step is not a formality. A house up a narrow, winding street in Castellammare or a flag lot in the Highlands may limit how long a panel can travel from the truck, and that can change the layout of the roof.
2. Written Scope
The scope is the document you compare between contractors. Ours names the seam type and profile, the metal and its thickness, the finish and color, the underlayment, the fire-rated assembly where one is required, what we will do with the gutters, what happens if we find damaged deck, and who pulls the permit. It also says who will install the roof: our own crew.
We do not publish prices, because a metal roof replacement is priced from the roof itself. The area and pitch, the number of details, the access, the metal and finish you choose and the condition of the deck all move the number.
3. Permit
Pacific Palisades is a neighborhood of the City of Los Angeles, not a separate city. That means your roof is permitted and inspected by the Los Angeles Department of Building and Safety (LADBS), not by the county. Re-roofing a house requires a permit, and the inspector checks the work at the stages LADBS requires.
Two code topics come up on almost every Palisades re-roof:
- Fire rating. Where a property is in a Very High Fire Hazard Severity Zone, the new roof covering generally has to be Class A. You can look up your parcel's fire zone in the City's ZIMAS parcel map.
- Cool roof. Los Angeles has cool roof requirements that cover many residential re-roofs. The color you choose needs a rated reflectance that meets the requirement for your roof. We check the rated values before the color is ordered.
4. Fabrication in Our Shop
While the permit moves, our Van Nuys shop forms the panels and trim to your measurements and color. Ridge caps, eave and rake trim, valley pans and wall flashings come from the same coil as the panels, so the colors match.
5. Tear-Off
The old roof comes off down to the deck, section by section. We protect landscaping, windows and walkways, and we load debris as we go so it does not sit around the house. The goal is to open only as much roof as we can dry in the same day.
6. Deck Inspection and Repair
With the old roofing gone, we can see the deck. This is where a replacement earns its keep. We look for soft spots, rot around old leaks, delaminated plywood, gaps and fasteners that have backed out. Damaged boards are replaced. If something turns up that the scope did not cover, we show you before we fix it.
7. Underlayment and Flashings
A high-temperature underlayment rated for metal goes down over the deck. In fire hazard zones it is installed as part of the Class A assembly named in the scope. Then the base flashings go in at walls, valleys and penetrations, with closures at the eaves and ridges.
8. Panels and Trim
Panels are set on concealed clips and locked together at the seams. Trim closes the edges. Penetrations are flashed with boots or shop-made curbs. The roof is cleaned of metal shavings and debris as it goes on, because steel filings left on a roof will rust and stain the finish.
9. Inspection and Walk-Through
LADBS inspects at the required stages. When the roof is done, we walk it with you, go over the details, and leave the site clean. You get the paperwork for the materials and the work.
03
Replacing Tile, Shingle or Shake With Standing Seam
Many Palisades homes have clay or concrete tile, asphalt shingle or an older wood roof. Each one brings something to plan for when the roof changes to standing seam.
- From tile. Tile is heavy, and standing seam is much lighter. Taking weight off a roof is not a problem for the structure, but tile roofs often use battens and different edge details that come out with the tile. The fascia, eaves and gutters may need adjustment to suit metal.
- From shingle. The most straightforward change. The deck is usually already solid sheathing, and the existing gutters may stay if they are sound.
- From wood shake. Older shake roofs were often laid on spaced boards rather than solid sheathing. Standing seam needs a solid deck, so new sheathing is often part of the job.
- From older exposed-fastener metal. We remove the old panels entirely. Concealed-fastener standing seam is a different system and is not laid over the old panels.
04
Gutters, Skylights and Solar
A re-roof is the right time to deal with everything that sits on or at the edge of the roof.
Gutters. Metal roofs shed water fast and in sheets. Gutters need to be sized and placed for that. In fire hazard zones, California's wildfire building rules also address gutters and debris, so we plan the gutter and its protection together.
Skylights. Old skylights are a common leak source. If yours are aging, replacing them during the roof job lets us flash the new ones into the new roof properly instead of patching around old frames.
Solar. If you have panels, they come off before the tear-off and go back on after. Standing seam allows clamp-on solar mounts that grip the seams without drilling the roof surface. If you plan to add solar later, tell us now so the layout can allow for it.
05
Living at Home During the Work
Most families stay at home during a metal roof replacement. There is noise during tear-off and while the panels go on, and there will be a crew and a truck at the house during working hours. We keep the driveway usable where we can, keep the site picked up at the end of each day, and dry in any opened roof before we leave.
In the Alphabet Streets and other closely built blocks, we also think about the neighbors: where materials are staged, when deliveries arrive and how debris leaves the site.
06
Why the Same Company Should Measure, Fabricate and Install
Metal roof replacement in Pacific Palisades involves a lot of handoffs if they are spread across companies: the estimator, the panel supplier, the trim shop and the installer. Each handoff is a chance for a measurement to be misread or a detail to be guessed. We keep all of it in one company. We measure, our shop forms the panels and trim, and our own crew installs them. No subcontractors, ever.
Eclipse Metal Roofing has been roofing in Los Angeles since 2006 under California contractor license #888710. You can read more about the company on EclipseMetalRoofing.com, or call us at (424) 399-5385 to arrange a visit.